We had the pleasure of recently working with Molsbee Roofing for a roof replacement and I have to say they exceeded our expectations! Everything from start to finish was excellent, from the quote to the day the roof was finished. Clear communication, quality workmanship, and a clean site.Read on Google

Request your free inspection
Since 1975 · 4.8 stars across 200+ Google reviews · Florida Certified Roofing Contractor CCC1327429 · Lifetime Workmanship Warranty · GAF Certified Contractor · Owens Corning Preferred Contractor
50 Years
GAF Certified Contractor
Owens Corning Preferred Contractor
BBBLifetime Workmanship Warranty
Metal roof replacement in Jupiter requires a panel system suited to the building's exposure and permitted appearance. We compare standing seam and exposed-fastener assemblies after inspecting the roof, rather than selecting a panel from color alone.
A water-facing home near Jonathan's Landing presents different connection details from a sheltered Abacoa property. We document those differences and provide the proposed assembly and price in writing.
- Standing seam and 5Vmetal roof systems
- Lifetimeworkmanship warranty
- CCC1327429Florida licensed




Before a metal reroof in Jupiter
Salt reaches a Jupiter metal roof from two sides
Jupiter sits where the Loxahatchee River meets the Atlantic at the inlet, so a roof near the inlet, on the Intracoastal or along the beach takes salt air from the river side and the ocean side. For those homes we specify the panel coating, the edge metal, the clips and the fasteners as one compatible set, because a bare cut edge or a mismatched screw is where rust starts.
A sheltered street in Abacoa or out in Jupiter Farms can use a different specification. Both get written down, so you know which metal you are buying and why it was chosen for your exposure.
Standing seam or exposed fastener: the choice that matters most
Standing seam hides its clips under the panel; an exposed-fastener system puts screws through the face where sun and salt reach them. Standing seam costs more to buy and install and needs less attention over its life.
Exposed-fastener costs less and suits an outbuilding or a low, simple roof. We look at the roof shape, the deck and the exposure before recommending one, and the proposal names the panel, the gauge, the finish and the attachment so another quote can be compared with it line by line.
Repair the panels you have, or replace them
A metal roof leaking at a few screws or one rusted valley is usually a repair: we replace the fasteners, reseal or replace the flashing and check the panel ends. Replacement is the honest answer when the coating has failed across the roof, the panels are rusting from the cut edges or the deck underneath has softened.
Some owners in Admirals Cove and Jonathan's Landing ask about metal when the original tile wears out; that is a replacement conversation, and we price it as one. We inspect first and put the repair-or-replace reasoning in writing with photographs.
Abacoa approval first, then the Jupiter permit through JCDS
In Abacoa the neighborhood association reviews exterior changes, and neighborhoods from Antigua to Mallory Creek each hold their own material and color expectations, so get that written approval before the Town sees the application. Then we file the re-roof permit with the Town of Jupiter Building Department on Military Trail through its JCDS portal, which also carries every inspection booking.
Homes along the beach and the Intracoastal sit in the town's higher wind band, so the fastening for that exposure is on the drawings, and a secondary water barrier goes on the deck before the panels do.
How it works in Jupiter

Permits in Jupiter
On a metal reroof in Jupiter, the permit through JCDS portal and any appearance review decide when the panels can be ordered, so we settle them before the material.
Jupiter runs its own building department on Military Trail, separate from the county, and everything goes through the Jupiter Community Development System: the re-roof permit, the documents and every inspection booking. The town also writes the working hours into its code: Monday to Friday 7 am to 8 pm, Saturday 8 am to 4 pm, and no work on Sundays.
Along the beach, the Intracoastal and the Loxahatchee River the design wind speed is 170 mph; inland it drops to 160 mph. The flood maps changed in December 2024, and the town says the new lines reach low-lying streets and canal and lake lots, not just A1A. On our re-roofs a self-adhered secondary water barrier is sealed to the deck before the new roof goes on.
- River mouth, inlet and beach
- Jupiter sits where the Loxahatchee River meets the Atlantic at the inlet, so salt air reaches roofs from two sides. Edge metal, flashing and fastener choice matter more here than a few miles inland.
- Abacoa's street-by-street roofs
- In Abacoa the roofs are tile, metal or asphalt shingle depending on the neighbourhood, from Antigua to Mallory Creek. We match the existing material and profile so the street still reads as one.
- Houses from the late 1980s
- The median Jupiter home dates to 1989. In Admirals Cove and Jonathan's Landing that means original tile and underlayment reaching the end of their life together, so we inspect both, not just the surface.
What homeowners say
I would highly recommend Molsbee Roofing! Nicole the office manager was keeping us informed from beginning to end, was extremely professional and excellent customer service throughout the entire process. They had a great team working on our roof and we are completely satisfied!Read on Google



We signed or completed a handful of roofing jobs with a Jupiter address over the last twelve months.
All service areas ↗
Metal roof replacement questions in Jupiter
Is a metal roof worth it near Jupiter's inlet?
Yes, if the metal is specified for salt. The panels, the coating, the edge metal and every fastener need to be compatible with each other and with the exposure, or corrosion starts at the first cut edge.
Near the inlet, the Intracoastal and the beach that specification is different from what an inland street needs. A metal roof done that way holds up well on the water; done carelessly it rusts from the details outward.
We write the specification into the proposal so you can hold us to it.
Do you repair metal roofs in Jupiter, or only replace them?
Both. Most metal roof calls we take in Jupiter are repairs: backed-out or rusted screws, a corroded valley, a flashing that has opened at a wall, a panel end lifted by wind.
We replace the affected fasteners and metal and check the rest of the roof while we are up there. We recommend replacement only when the finish has failed across the roof, the panels are rusting through or the deck under them is soft, and the report shows you the photographs behind that recommendation.
Can an Abacoa tile roof be changed to metal?
Often, but the neighborhood decides before the Town does. Abacoa's neighborhoods each hold their own material and color expectations, and a metal roof on a Tuscany street does not mean the same profile is approved in Windsor Park.
Bring us the association's current written requirements and we describe a panel, profile and finish that fits them, then file the permit through JCDS once approval is in hand. We do not order panels or promise a date before that letter exists.
What decides the price of a metal roof replacement in Jupiter?
Roof area and pitch, the panel system and gauge, the coating grade, how much old roofing comes off, the condition of the deck underneath and the amount of flashing and edge metal the roof needs. Standing seam costs more than exposed fastener; a coastal specification costs more than an inland one.
The free inspection measures all of that, and the written price shows each part, with a stated allowance for deck repairs found after tear-off. Financing on approved credit can be built into that same proposal.
What is covered after the metal roof is installed?
Two things, both in writing. Our lifetime workmanship warranty covers the installation itself: the seams, the fastening, the flashing and the details our people built.
The panel manufacturer covers the metal and its finish with its product warranty, which depends on the product you choose. We hand you both documents at the end of the job, and we explain where one ends and the other begins before you sign, so a finish question and an installation question each go to the right place.


